KWR-1 / KITCHEN WORK ROBOT / CURRENT PLATFORM
One body.
Many checks.
The first room where the pipeline has a full engineering trail: CAD, subassemblies, drawings, BOM lines, wiring, assembly notes, simulation gates, and renders that make the model inspectable.
20 configurations / procurement release blocked
CADGLB
SUBASSEMBLIES09
WIRINGSVG
STATUSOPEN




The body is not the brochure.
The export is.
This package is deliberately split by engineering responsibility. The CAD folder contains the actual model exports. BOM and sourcing remain engineering draft material, with placeholders and open items called out. Electronics contains the one-line and schedules. Verification reports simulated behavior; they do not certify a built robot. That distinction is part of the product story.
01—05 / OPEN KWR-1 PACKAGE
01 / CADRobot GLBFull robot model export for inspection.
01 / CADFull scene GLBRobot plus environment scene export.
02 / BOMEngineering BOMCounted lines with the procurement-blocked status intact.
03 / ELECTRONICSWiring SVGOne-line electrical interconnect drawing.
03 / ELECTRONICSWiring notesPower, signal, protection, and limitations.
04 / ASSEMBLYAssembly notesFit-up, service access, and maintenance context.
05 / VERIFICATIONVerification reportSimulation and gate results for the current package.
05 / VERIFICATIONPhysics gateWhat the simulation does—and does not—prove.
06 / RENDERSWrist toolingClose-up render of the contact interface.
ENGINEERING-DEVELOPMENT EXPORT / NOT AN ORDERABLE BOM / NOT A MANUFACTURING RELEASE / SIMULATION EVIDENCE IS LABELED AS SIMULATION